Skip to content

What do you need from us to answer the contra-charges already taken?

Your signed contract, the deduction schedule, the notices with proof of arrival, the records behind each item, and every valuation and payment notice to date.

by Jack Butler-Kettle, MCIArb, NEC Registered Adjudicator · Last reviewed · About 2 min readShare

The answer

The contract comes first. It sets its own conditions for set-off, notice, timing and evidence, and a deduction that fails them may fall before anyone argues the merits.

Send the schedule as the original spreadsheet if you can, so we can see how each line is made up. Send each notice as the email that actually carried it, timestamp intact. A deduction from an interim payment needs a valid notice given in time.

Forward the emails around each item as the originals. A deduction with no complaint or notice to remedy behind it is part of the answer. Send the diaries, handover sheets, photographs and delivery tickets that show what was actually done. The run of valuations and notices shows any charge taken twice, or taken and never credited back when withdrawn.

After that, we have one call on each significant item: what was done, what was agreed and what the site records show.

If a pay less notice has just landed, or a reply period or payment date runs out this week, say so first. We agree urgent support against the verified contractual or procedural timetable and our capacity. A pay less notice has no universal statutory reply period, and a reservation of rights does not cure every missed requirement.

To have the deductions already taken answered line by line, see our Contra-charge review and challenge service.

Browse payment and deductions in the Library

Browse the Library