Repair quantities only known after access
The challenge
You cannot always determine the extent of stone, timber or roof repairs from ground-level inspection. A lump-sum allowance may conceal considerable uncertainty until scaffold access or careful opening-up is available.
Our approach
We use measurable repair schedules based on the conservation team's specification. Exposed conditions and instructed repairs are recorded jointly where possible, allowing provisional allowances to be reconciled with the work actually required.