Dock gates, pumps and civil structures
The challenge
A dry dock's gates, seals and dewatering systems must work with its concrete structure and service routes. Revised equipment details or unexpected existing geometry can create changes across several packages.
Our approach
We reconcile the dock survey and supplier data with the civil and installation packages. A revised gate or seal detail can alter concrete, connections and the installation method together. The change record needs to identify that chain, while distinguishing a new requirement from correcting work that did not meet the original specification.