Dredgeability differing from the investigation
The challenge
Material strength, buried obstructions and mixed strata affect the equipment and production rate needed to dredge an area. A measured volume alone does not explain the cost of materially different conditions.
Our approach
We compare the material encountered with the investigation and the contract's ground baseline. Production logs and technical findings help explain whether the difference changed the equipment, method or rate of progress. A larger volume and more difficult dredgeability are separate questions, and each needs its own assessment under the agreed risk allocation.