Crushing and screening upgrades during production
The challenge
Replacing a crusher, screen or conveyor can require a short shutdown and temporary material-handling arrangements. Discoveries at existing foundations or transfer points can extend the outage.
Our approach
We establish the condition and outage assumptions behind the price. Once the existing line is opened up, discoveries and technical instructions are recorded separately from the recovery measures taken to reopen it. Extra foundation work and an instructed extra shift may arise from the same event, but need different quantity and resource evidence in the account.