Route surveys changing burial and protection
The challenge
A changed crossing or seabed condition can require a different burial method, extra protection or a revised route. Vessel time and material quantities may both increase.
Our approach
We compare the survey baseline and specified protection scope with the instructed route. Quantities and vessel records are reconciled separately so changed work and productivity effects are not counted twice.