Measures that depend on each other
The challenge
An insulation or heating quotation can leave out the ventilation, electrical alterations and making good required by the combined retrofit design.
Our approach
We review the measures together against the designer's requirements. Each enabling item needs an identified allowance and package owner. When the design develops, we assess the change across the affected installation rather than accepting separate extras without checking how they connect.