Shared structures with different occupier requirements
The challenge
Homes, shops and offices may share a podium, basement or plant space while requiring different servicing and acoustic arrangements. A change for one occupier can alter work funded by another part of the scheme.
Our approach
We distinguish shared elements from use-specific work in the cost plan. A change is traced through the affected structure and services before allocating its cost. This makes the basis of the allocation visible rather than assigning an arbitrary proportion to each occupier.