Pool tanks, finishes and water testing
The challenge
On swimming-pool schemes, tank testing, waterproofing and finishes need a coordinated sequence. Leakage or delayed testing can require repeat attendance and create disputes about whether the tank, lining or penetrations are responsible.
Our approach
The technical investigation needs to establish where the leakage or failure originates. We use those findings alongside the package scopes and testing records to assess investigative work, rectification and consequential attendance separately. This avoids passing the whole cost of a failed test to whichever trade happened to attend it.