Skip to content

CDP (contractor's designed portion)

The part of a JCT building contract that the contractor designs.

by Jack Butler-Kettle · About 1 min readShare

Further detail

Read this alongside JCT Design and Build Contract 2016: Simply Fair.

A contractor's designed portion identifies design work allocated to the contractor within the relevant JCT arrangement. A subcontractor's duties depend on what its own appointment passes down. Design development, coordination and responsibility for specified performance may involve different obligations.

Compare the design scope with qualifications and insurance requirements. A Construction contract review before signing can highlight obligations needing agreement before design starts.

Sources

  1. JCT Design and Build Contract 2016: Simply Fair (12 July 2017). The Joint Contracts Tribunal.

Browse the Library