Temporary support and the construction sequence
The Challenge
Bridge erection, bearing replacement and structural alterations can depend on jacking, propping or staged loading. A revised sequence may change substantial temporary works without changing the finished structure.
Our approach
We identify the temporary support and sequence included at tender, then check the engineer's revised requirements. The price may involve more than extra steel: redesign, specialist jacking, hire duration and removal can all change. We assess those elements together and reconcile any temporary-work allowance already included in the permanent rates.