Existing services differ from the records
The Challenge
The service shown on the drawing may be at a different depth, or there may be another service that is not shown at all.
Our approach
We retain the tender information and survey assumptions, then record the discovery and instructed response by location. Additional investigation, revised permanent work and temporary protection are assessed separately. That makes the change understandable without assuming that every unrecorded asset automatically entitles the contractor to extra payment.