Ground-mounted foundations and actual site conditions
The Challenge
Pile refusal, different ground levels or revised drainage can change the foundation solution and array layout. Repeated small changes across a large field can materially affect the civil account.
Our approach
We reconcile the priced ground assumptions with pile tests, site records and the technical instruction. Across a large array, a small change to each foundation can become a material cost, so sampling and quantities need a clear basis. We also distinguish extra units from a changed installation method and credit foundations or work no longer required.