Source: https://www.quantsurv.com/george
Content format: Markdown version of the public page.
Content reviewed: 2026-11-04

Interactive forms, calculators and booking actions require the linked web page. Any displayed calculation is the page's initial example, not a calculation for your circumstances.

# The AI agent that helps you build construction claims

George reads your documents, sets out each part of your claim and tracks every notice it needs, for subcontractors and main contractors

## Join George’s launch list

George launches soon. We will email you once, when he is ready for you.

Email address

We use your address only to tell you when George launches. We send a confirmation email first, and you can leave the list at any time. See our [privacy notice](<https://www.quantsurv.com/privacy>).

Already have access? [Sign in](<https://george.quantsurv.com/workspace/>)

## Meet George

George is an AI agent, not a person. We built him to help you prepare a construction claim that is complete, evidenced and made on time.

### George is for you if

-   You are a subcontractor or main contractor
-   You have a claim for more time or money on construction work in England and Wales
-   You want to prepare the claim yourself, with every step recorded

![George, Quantsurv's AI agent](<https://www.quantsurv.com/images/george/george.svg?v=1.0.0>)

## How George works

Every claim moves through these four stages. George proposes each one for you to approve, then sets out the whole claim for you to check and issue.

1.  Step 01
    
    ### Cause
    
    What happened and when, from your documents
    
2.  Step 02
    
    ### Effect
    
    The time or cost it led to
    
3.  Step 03
    
    ### Entitlement
    
    The clauses and notices the claim rests on
    
4.  Step 04
    
    ### Substantiation
    
    The evidence for each part, and what is missing
    

## The claims George works on

### Variations

For changed or added work that must be valued, under JCT, NEC or FIDIC forms or your own contract

<table role="table" class="agent-compare agent-facts w-full border-collapse" data-agent-facts=""><caption class="sr-only">Variations: when to use George, what he works out, what he needs from you and when he hands the claim to Quantsurv</caption><tbody role="rowgroup"><tr role="row" data-agent-fact=""><th role="rowheader" scope="row" class="agent-compare-label type-body font-semibold text-foreground">Use George when</th><td role="cell" class="agent-compare-cell type-body text-foreground"><ul class="grid gap-3 "><li class="flex items-start gap-3 type-body text-foreground"><span aria-hidden="true" class="mt-0.5 inline-flex h-5 w-5 shrink-0 items-center justify-center bg-brand text-brand-foreground"><svg viewBox="0 0 20 20" class="h-4 w-4" fill="none" focusable="false"><path d="M4.5 10.5l3.5 3.5 7.5-8" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round"></path></svg></span><span class="min-w-0">You were instructed to do more, less or different work</span></li><li class="flex items-start gap-3 type-body text-foreground"><span aria-hidden="true" class="mt-0.5 inline-flex h-5 w-5 shrink-0 items-center justify-center bg-brand text-brand-foreground"><svg viewBox="0 0 20 20" class="h-4 w-4" fill="none" focusable="false"><path d="M4.5 10.5l3.5 3.5 7.5-8" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round"></path></svg></span><span class="min-w-0">The work changed without a written instruction</span></li><li class="flex items-start gap-3 type-body text-foreground"><span aria-hidden="true" class="mt-0.5 inline-flex h-5 w-5 shrink-0 items-center justify-center bg-brand text-brand-foreground"><svg viewBox="0 0 20 20" class="h-4 w-4" fill="none" focusable="false"><path d="M4.5 10.5l3.5 3.5 7.5-8" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round"></path></svg></span><span class="min-w-0">Your valuation of a change was rejected or cut</span></li></ul></td></tr><tr role="row" data-agent-fact=""><th role="rowheader" scope="row" class="agent-compare-label type-body font-semibold text-foreground">What George works out</th><td role="cell" class="agent-compare-cell type-body text-foreground"><ul class="grid gap-3 "><li class="flex items-start gap-3 type-body text-foreground"><span aria-hidden="true" class="mt-0.5 inline-flex h-5 w-5 shrink-0 items-center justify-center bg-brand text-brand-foreground"><svg viewBox="0 0 20 20" class="h-4 w-4" fill="none" focusable="false"><path d="M4.5 10.5l3.5 3.5 7.5-8" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round"></path></svg></span><span class="min-w-0">Which instruction or change each item rests on, from your documents</span></li><li class="flex items-start gap-3 type-body text-foreground"><span aria-hidden="true" class="mt-0.5 inline-flex h-5 w-5 shrink-0 items-center justify-center bg-brand text-brand-foreground"><svg viewBox="0 0 20 20" class="h-4 w-4" fill="none" focusable="false"><path d="M4.5 10.5l3.5 3.5 7.5-8" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round"></path></svg></span><span class="min-w-0">The valuation rules in your contract, and which apply</span></li><li class="flex items-start gap-3 type-body text-foreground"><span aria-hidden="true" class="mt-0.5 inline-flex h-5 w-5 shrink-0 items-center justify-center bg-brand text-brand-foreground"><svg viewBox="0 0 20 20" class="h-4 w-4" fill="none" focusable="false"><path d="M4.5 10.5l3.5 3.5 7.5-8" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round"></path></svg></span><span class="min-w-0">The notice your contract asks for, and when it is due</span></li><li class="flex items-start gap-3 type-body text-foreground"><span aria-hidden="true" class="mt-0.5 inline-flex h-5 w-5 shrink-0 items-center justify-center bg-brand text-brand-foreground"><svg viewBox="0 0 20 20" class="h-4 w-4" fill="none" focusable="false"><path d="M4.5 10.5l3.5 3.5 7.5-8" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round"></path></svg></span><span class="min-w-0">What each item still needs before it can be valued</span></li></ul></td></tr><tr role="row" data-agent-fact=""><th role="rowheader" scope="row" class="agent-compare-label type-body font-semibold text-foreground">What George needs from you</th><td role="cell" class="agent-compare-cell type-body text-foreground"><p>Your contract, the instructions or drawings that changed the work, your records of it and any valuation you have sent</p></td></tr><tr role="row" data-agent-fact=""><th role="rowheader" scope="row" class="agent-compare-label type-body font-semibold text-foreground">When George hands the claim to Quantsurv</th><td role="cell" class="agent-compare-cell type-body text-foreground"><p>A disputed instruction, a refusal to value the change, or a claim heading to adjudication</p></td></tr></tbody></table>

### Extension of time

For delay that entitles you to more time to finish, and relief from delay damages

<table role="table" class="agent-compare agent-facts w-full border-collapse" data-agent-facts=""><caption class="sr-only">Extension of time: when to use George, what he works out, what he needs from you and when he hands the claim to Quantsurv</caption><tbody role="rowgroup"><tr role="row" data-agent-fact=""><th role="rowheader" scope="row" class="agent-compare-label type-body font-semibold text-foreground">Use George when</th><td role="cell" class="agent-compare-cell type-body text-foreground"><ul class="grid gap-3 "><li class="flex items-start gap-3 type-body text-foreground"><span aria-hidden="true" class="mt-0.5 inline-flex h-5 w-5 shrink-0 items-center justify-center bg-brand text-brand-foreground"><svg viewBox="0 0 20 20" class="h-4 w-4" fill="none" focusable="false"><path d="M4.5 10.5l3.5 3.5 7.5-8" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round"></path></svg></span><span class="min-w-0">An event outside your control delayed completion</span></li><li class="flex items-start gap-3 type-body text-foreground"><span aria-hidden="true" class="mt-0.5 inline-flex h-5 w-5 shrink-0 items-center justify-center bg-brand text-brand-foreground"><svg viewBox="0 0 20 20" class="h-4 w-4" fill="none" focusable="false"><path d="M4.5 10.5l3.5 3.5 7.5-8" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round"></path></svg></span><span class="min-w-0">You need to notify a delay and its effect</span></li><li class="flex items-start gap-3 type-body text-foreground"><span aria-hidden="true" class="mt-0.5 inline-flex h-5 w-5 shrink-0 items-center justify-center bg-brand text-brand-foreground"><svg viewBox="0 0 20 20" class="h-4 w-4" fill="none" focusable="false"><path d="M4.5 10.5l3.5 3.5 7.5-8" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round"></path></svg></span><span class="min-w-0">Your request for more time was refused or not answered</span></li></ul></td></tr><tr role="row" data-agent-fact=""><th role="rowheader" scope="row" class="agent-compare-label type-body font-semibold text-foreground">What George works out</th><td role="cell" class="agent-compare-cell type-body text-foreground"><ul class="grid gap-3 "><li class="flex items-start gap-3 type-body text-foreground"><span aria-hidden="true" class="mt-0.5 inline-flex h-5 w-5 shrink-0 items-center justify-center bg-brand text-brand-foreground"><svg viewBox="0 0 20 20" class="h-4 w-4" fill="none" focusable="false"><path d="M4.5 10.5l3.5 3.5 7.5-8" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round"></path></svg></span><span class="min-w-0">Whether your contract lets you claim time for the event</span></li><li class="flex items-start gap-3 type-body text-foreground"><span aria-hidden="true" class="mt-0.5 inline-flex h-5 w-5 shrink-0 items-center justify-center bg-brand text-brand-foreground"><svg viewBox="0 0 20 20" class="h-4 w-4" fill="none" focusable="false"><path d="M4.5 10.5l3.5 3.5 7.5-8" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round"></path></svg></span><span class="min-w-0">Each notice due, what it must say and its time bar</span></li><li class="flex items-start gap-3 type-body text-foreground"><span aria-hidden="true" class="mt-0.5 inline-flex h-5 w-5 shrink-0 items-center justify-center bg-brand text-brand-foreground"><svg viewBox="0 0 20 20" class="h-4 w-4" fill="none" focusable="false"><path d="M4.5 10.5l3.5 3.5 7.5-8" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round"></path></svg></span><span class="min-w-0">Which records show the delay and its effect on completion</span></li><li class="flex items-start gap-3 type-body text-foreground"><span aria-hidden="true" class="mt-0.5 inline-flex h-5 w-5 shrink-0 items-center justify-center bg-brand text-brand-foreground"><svg viewBox="0 0 20 20" class="h-4 w-4" fill="none" focusable="false"><path d="M4.5 10.5l3.5 3.5 7.5-8" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round"></path></svg></span><span class="min-w-0">What the claim still needs before it is complete</span></li></ul></td></tr><tr role="row" data-agent-fact=""><th role="rowheader" scope="row" class="agent-compare-label type-body font-semibold text-foreground">What George needs from you</th><td role="cell" class="agent-compare-cell type-body text-foreground"><p>Your contract, the programme and its updates, site records and the correspondence about the delay</p></td></tr><tr role="row" data-agent-fact=""><th role="rowheader" scope="row" class="agent-compare-label type-body font-semibold text-foreground">When George hands the claim to Quantsurv</th><td role="cell" class="agent-compare-cell type-body text-foreground"><p>Concurrent delay, a dispute over the completion date, or a delay that needs a programme analysis</p></td></tr></tbody></table>

### Loss and expense

For the extra cost of delay or disruption that your contract lets you recover

<table role="table" class="agent-compare agent-facts w-full border-collapse" data-agent-facts=""><caption class="sr-only">Loss and expense: when to use George, what he works out, what he needs from you and when he hands the claim to Quantsurv</caption><tbody role="rowgroup"><tr role="row" data-agent-fact=""><th role="rowheader" scope="row" class="agent-compare-label type-body font-semibold text-foreground">Use George when</th><td role="cell" class="agent-compare-cell type-body text-foreground"><ul class="grid gap-3 "><li class="flex items-start gap-3 type-body text-foreground"><span aria-hidden="true" class="mt-0.5 inline-flex h-5 w-5 shrink-0 items-center justify-center bg-brand text-brand-foreground"><svg viewBox="0 0 20 20" class="h-4 w-4" fill="none" focusable="false"><path d="M4.5 10.5l3.5 3.5 7.5-8" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round"></path></svg></span><span class="min-w-0">A delay or disruption caused you extra cost</span></li><li class="flex items-start gap-3 type-body text-foreground"><span aria-hidden="true" class="mt-0.5 inline-flex h-5 w-5 shrink-0 items-center justify-center bg-brand text-brand-foreground"><svg viewBox="0 0 20 20" class="h-4 w-4" fill="none" focusable="false"><path d="M4.5 10.5l3.5 3.5 7.5-8" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round"></path></svg></span><span class="min-w-0">You stayed on site longer than planned</span></li><li class="flex items-start gap-3 type-body text-foreground"><span aria-hidden="true" class="mt-0.5 inline-flex h-5 w-5 shrink-0 items-center justify-center bg-brand text-brand-foreground"><svg viewBox="0 0 20 20" class="h-4 w-4" fill="none" focusable="false"><path d="M4.5 10.5l3.5 3.5 7.5-8" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round"></path></svg></span><span class="min-w-0">Your application for the extra cost was rejected</span></li></ul></td></tr><tr role="row" data-agent-fact=""><th role="rowheader" scope="row" class="agent-compare-label type-body font-semibold text-foreground">What George works out</th><td role="cell" class="agent-compare-cell type-body text-foreground"><ul class="grid gap-3 "><li class="flex items-start gap-3 type-body text-foreground"><span aria-hidden="true" class="mt-0.5 inline-flex h-5 w-5 shrink-0 items-center justify-center bg-brand text-brand-foreground"><svg viewBox="0 0 20 20" class="h-4 w-4" fill="none" focusable="false"><path d="M4.5 10.5l3.5 3.5 7.5-8" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round"></path></svg></span><span class="min-w-0">The clause the claim rests on, and its notice rules</span></li><li class="flex items-start gap-3 type-body text-foreground"><span aria-hidden="true" class="mt-0.5 inline-flex h-5 w-5 shrink-0 items-center justify-center bg-brand text-brand-foreground"><svg viewBox="0 0 20 20" class="h-4 w-4" fill="none" focusable="false"><path d="M4.5 10.5l3.5 3.5 7.5-8" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round"></path></svg></span><span class="min-w-0">The heads of cost to claim, such as site overheads and disruption</span></li><li class="flex items-start gap-3 type-body text-foreground"><span aria-hidden="true" class="mt-0.5 inline-flex h-5 w-5 shrink-0 items-center justify-center bg-brand text-brand-foreground"><svg viewBox="0 0 20 20" class="h-4 w-4" fill="none" focusable="false"><path d="M4.5 10.5l3.5 3.5 7.5-8" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round"></path></svg></span><span class="min-w-0">Which costs your records support, and which they do not yet</span></li><li class="flex items-start gap-3 type-body text-foreground"><span aria-hidden="true" class="mt-0.5 inline-flex h-5 w-5 shrink-0 items-center justify-center bg-brand text-brand-foreground"><svg viewBox="0 0 20 20" class="h-4 w-4" fill="none" focusable="false"><path d="M4.5 10.5l3.5 3.5 7.5-8" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round"></path></svg></span><span class="min-w-0">What evidence each head of claim still needs</span></li></ul></td></tr><tr role="row" data-agent-fact=""><th role="rowheader" scope="row" class="agent-compare-label type-body font-semibold text-foreground">What George needs from you</th><td role="cell" class="agent-compare-cell type-body text-foreground"><p>Your contract, cost records, the programme and the correspondence about the delay or disruption</p></td></tr><tr role="row" data-agent-fact=""><th role="rowheader" scope="row" class="agent-compare-label type-body font-semibold text-foreground">When George hands the claim to Quantsurv</th><td role="cell" class="agent-compare-cell type-body text-foreground"><p>A global claim, a disruption analysis, disputed costs, or a claim heading to adjudication</p></td></tr></tbody></table>

## Control and security

You decide what goes into your claim

<table role="table" class="agent-compare agent-facts w-full border-collapse" data-agent-facts=""><caption class="sr-only">How you stay in control of George, and how he treats your documents and data</caption><tbody role="rowgroup"><tr role="row" data-agent-fact=""><th role="rowheader" scope="row" class="agent-compare-label type-body font-semibold text-foreground">Your approval</th><td role="cell" class="agent-compare-cell type-body text-foreground"><p>George proposes and you decide. Nothing goes into your claim until you approve it.</p></td></tr><tr role="row" data-agent-fact=""><th role="rowheader" scope="row" class="agent-compare-label type-body font-semibold text-foreground">Inside your workspace</th><td role="cell" class="agent-compare-cell type-body text-foreground"><p>George works only inside your claims workspace. He sends nothing to anyone, and you issue every document yourself.</p></td></tr><tr role="row" data-agent-fact=""><th role="rowheader" scope="row" class="agent-compare-label type-body font-semibold text-foreground">Every point traced</th><td role="cell" class="agent-compare-cell type-body text-foreground"><p>Each point George makes links to the document and page it comes from. Where the evidence is missing, he says so rather than filling the gap.</p></td></tr><tr role="row" data-agent-fact=""><th role="rowheader" scope="row" class="agent-compare-label type-body font-semibold text-foreground">Notices and time bars</th><td role="cell" class="agent-compare-cell type-body text-foreground"><p>George shows each notice period and time bar with the clause it comes from, and you confirm the dates</p></td></tr><tr role="row" data-agent-fact=""><th role="rowheader" scope="row" class="agent-compare-label type-body font-semibold text-foreground">How George uses AI</th><td role="cell" class="agent-compare-cell type-body text-foreground"><p>George’s AI reads your documents and drafts each part of the claim for you to check. A quote he gives is checked against your document before you see it.</p></td></tr><tr role="row" data-agent-fact=""><th role="rowheader" scope="row" class="agent-compare-label type-body font-semibold text-foreground">Your data and record</th><td role="cell" class="agent-compare-cell type-body text-foreground"><p>Your claims are private to your account and to Quantsurv, and George’s AI provider, Anthropic, may process your documents outside the UK. Every upload, change and approval is kept with its date and who made it. George’s section of our privacy notice will be published before sign-up opens. <a href="/privacy" class="font-medium text-foreground underline underline-offset-4 hover:decoration-2">Privacy notice</a></p></td></tr></tbody></table>

## George, a claims consultant or doing it yourself

What each option does for you

George compared with hiring a claims consultant or doing it yourself
|  | With George | Hiring a claims consultant | Doing it yourself |
| --- | --- | --- | --- |
| Your claim prepared | Yes | Yes | Yes |
| Notices and time bars tracked for you | Yes | Yes | No |
| Every point linked to its evidence | Yes | Yes | No |
| Gaps in your evidence found for you | Yes | Yes | No |
| A QS ready if it becomes a dispute | Yes | Yes | No |
| A live view of every claim and what it still needs | Yes | No | No |

### What George does not do

-   Give legal advice. Quantsurv is not a firm of solicitors
-   Send your claim. You issue every document
-   Analyse your programme for delay. Quantsurv does that work
-   Promise your claim will be accepted
-   Represent you in adjudication or court

## Questions about George

### What is a time bar?

A deadline in your contract for giving notice. Miss it and you can lose the right to claim.

[How George shows time bars](<https://www.quantsurv.com/george#control>)

### Does George send my claim?

No. George prepares it with you, and you decide when and how it goes.

### Where are my documents kept?

In private storage for your account. Each file is checked against its original fingerprint every time you download it.

### Can Quantsurv check my claim?

Yes. Review My Work has a Quantsurv QS check your claim before you issue it, for a fee agreed first.

[Review My Work](<https://www.quantsurv.com/support/review-my-work>)

### Which contracts does George read?

JCT, NEC and FIDIC forms and bespoke contracts. George reads the clauses in your own contract, so its amendments count.

### How is George different from Bob?

Bob recovers money that is already due. George helps you claim more time or money. Where an underpayment turns on a disputed variation, that variation is a claim for George.
