# The instructions happen on WhatsApp and stay there

The work gets done, the record never leaves somebody's phone, and the account pays for it.

by [Jack Butler-Kettle](<https://www.quantsurv.com/about#jack-butler-kettle>), MCIArb, NEC Registered Adjudicator · Last reviewed 11 October 2026 · About 2 min readShare

## What does this mean for me?

The instruction arrives as a voice note, a sketch or a short message at the end of a long thread. The work goes ahead. The original stays on one person's phone, buried among other chats, with no job reference and no backup.

A message shows what someone wrote. It does not prove they had authority, that it reached the right person the way your contract requires, or what it changed. If that phone is lost, replaced or wiped, the only record of the instruction goes with it.

## What do I need to do?

1.  Preserve the original message or voice note, sender, timestamp, attachments and surrounding conversation.
2.  Link it to the relevant drawing, area and change in scope.
3.  Check the sender's authority and confirm the instruction through the contractual route where required.
4.  Keep the confirmation, notices and resource records with the original message so the change remains traceable.

To have this done for you, see our [Variations and compensation events](<https://www.quantsurv.com/quantity-surveying#client-types>) service.

If the instruction changed the work and the price, see [what to do when you are doing changed work on a say-so](<https://www.quantsurv.com/variations/problems/work-on-a-say-so>).

[Browse changes and extra costs in the Library](<https://www.quantsurv.com/library#topic-changes>)

[Browse the Library](<https://www.quantsurv.com/library>)