# They say they never instructed the changes I've claimed

Our application includes changes we were asked to make, and the other party's answer is that nobody instructed them.

by [Jack Butler-Kettle](<https://www.quantsurv.com/about#jack-butler-kettle>), MCIArb, NEC Registered Adjudicator · Last reviewed 11 October 2026 · About 2 min readShare

## What does this mean for me?

Your application lists changes your team carried out. The other party's payment notice, the notice stating the sum it considers due and its basis, values them at nil with one line: not instructed. Some directions were given on walk-rounds, some by people who have since left the job, and some sit in messages nobody has opened since.

Drop them all and you lose the good ones. Press them all as one block and the weak ones drag the rest down. Check each item on its own. Who asked for it, and did they have authority under your contract? Was it confirmed in the required form and time? Was the work really outside your scope?

An unconfirmed direction can still be backed by drawings, emails and site records. A missing document does not prove no direction was given, and memory alone does not prove one was. Meanwhile the notices in each payment cycle decide what is paid this month, so watch their dates while you gather the evidence.

## What do I need to do?

1.  List each disputed change with its direction, issuer, authority and any confirmation.
2.  Compare the revised scope with the agreed baseline and records of the work carried out.
3.  Mark items supported by documents separately from those based only on recollection.
4.  Follow any confirmation procedure still available and submit the evidenced items with a clear request for the other party's response.

To have this done for you, see our [Variation Recovery](<https://www.quantsurv.com/claims/variation-recovery>) and [Variation management setup](<https://www.quantsurv.com/claims#client-types>) services.

To stop the next one going the same way, see [why to get it in writing before the work starts](<https://www.quantsurv.com/variations/tips/confirm-in-writing>).