Source: https://www.quantsurv.com/variations/faq/jct-clause-3-14-instructions-requiring-a-variation
Content format: Markdown version of the public page.
Content reviewed: 2026-10-14

# How does JCT SBC/Q 2016 clause 3.14 work?

Clause 3.14 in SBC/Q 2016 concerns the Architect/contract administrator's main-contract variation power. A subcontractor must identify the corresponding power and procedure in its own agreement.

by [Jack Butler-Kettle](<https://www.quantsurv.com/about#jack-butler-kettle>), MCIArb, NEC Registered Adjudicator · Last reviewed 14 October 2026 · About 2 min readShare

## The answer

Clause 3.14 in SBC/Q 2016 concerns the Architect/contract administrator's main-contract variation power. A subcontractor must identify the corresponding power and procedure in its own agreement. An upstream instruction does not automatically give the architect authority to vary your contract directly.

Check who can instruct your package, whether the direction falls within the agreed variation power, and any requirement to confirm oral directions. Record the instruction and compare it with the agreed scope, design responsibility and working restrictions. A change in drawings or site arrangements is a potential variation, not proof of payment by itself.

The SBC/Q provision distinguishes types of variation and includes a particular reasonable-objection mechanism for changes to certain restrictions. Do not translate that into a universal rule that a subcontractor can never object to scope changes. The actual contract power, limits, safety, feasibility and other legal grounds need consideration. Raise any concern promptly through the correct route while checking the duty to comply.

Record price and time consequences separately, with the required notices. A properly instructed variation usually remains valued within the applicable agreement; its size alone does not entitle you to abandon the contract or charge any price you choose. Conversely, a request outside the contractual power requires a specific assessment.

The useful record is the original scope, authorised direction, prompt response, relevant clause, valuation basis and effect on performance. Keep correspondence factual and obtain advice where authority, compliance or the right to object is disputed.

Our [Construction contract management](<https://www.quantsurv.com/quantity-surveying#client-types>) records the instruction and follows the confirmation and response procedure required by the applicable form.

[Browse changes and extra costs in the Library](<https://www.quantsurv.com/library#topic-changes>)

[Browse the Library](<https://www.quantsurv.com/library>)
