# Take every payment date from the signed contract and its amendments

A payment diary copied from the last job or the standard form is wrong wherever the amendments moved a date. Build each contract's dates from its own signed wording, and record the clause and the trigger behind every one.

by [Jack Butler-Kettle](<https://www.quantsurv.com/about#jack-butler-kettle>), MCIArb, NEC Registered Adjudicator · Last reviewed 10 October 2026 · About 2 min readShare

## Why

A payment diary can miss a deadline or carry a standard-form date that an amendment has changed. One amendment moves the application date from the last Friday to the 25th. Another cuts a notice window from 5 days to 3, or names a new address for payment documents. Each change sits in a schedule of amendments nobody reread after signing. The diary looks complete and is wrong. The first sign is a payment notice that arrives before your application was due, or an application the payer says was late.

## How do I do it?

1.  Collect the signed contract, its schedule of amendments and every document it makes part of the contract. Read the incorporated standard form with the executed amendments and document-priority provisions; do not rely on a superseded tender version.
2.  Record the clause behind each payment date, the event that triggers it, how the contract counts the days and how documents must be served.
3.  Write the action beside each date: who acts, who receives it, the form it takes and how it is sent.
4.  Keep your own early reminders separate from the contract deadline, so nobody mistakes an early target for the real date.
5.  Recheck the diary whenever an amendment, a new instruction or a changed address arrives.

Our [Payment applications and valuations](<https://www.quantsurv.com/quantity-surveying#client-types>) builds the payment routine around the executed terms rather than an assumed standard timetable.

[Browse payment and deductions in the Library](<https://www.quantsurv.com/library#topic-payment>)

[Browse the Library](<https://www.quantsurv.com/library>)