Source: https://www.quantsurv.com/sectors/infrastructure
Content format: Markdown version of the public page.
Content reviewed: 2026-10-13

# Infrastructure

Quantity surveying and claims support for infrastructure projects, including utilities, drainage, enabling works and civil engineering packages.

## Construction in this sector

Infrastructure work often depends on site information, access and coordination with existing assets. We can help turn quantities, progress and changes into a clear commercial account, whether you are commissioning the work or delivering a package.

[

### Communications

Quantity surveying and claims support for fibre, broadband, telecommunications and communications infrastructure construction.



](<https://www.quantsurv.com/sectors/infrastructure/communications>)

[

### Dams and reservoirs

Quantity surveying and claims support for reservoir construction, dam works and associated infrastructure.



](<https://www.quantsurv.com/sectors/infrastructure/dams-and-reservoirs>)

[

### Drainage and flood protection

Quantity surveying and claims support for drainage networks, attenuation, outfalls and flood-protection construction.



](<https://www.quantsurv.com/sectors/infrastructure/drainage-and-flood-protection>)

[

### Enabling works and site preparation

Quantity surveying and claims support for demolition, remediation, earthworks and site preparation.



](<https://www.quantsurv.com/sectors/infrastructure/enabling-and-earthworks>)

[

### Gas networks

Quantity surveying and claims support for gas distribution construction, diversions and network connections.



](<https://www.quantsurv.com/sectors/infrastructure/gas-networks>)

[

### Public realm and landscaping

Quantity surveying and claims support for streetscapes, public spaces, parks and external landscape works.



](<https://www.quantsurv.com/sectors/infrastructure/public-realm-and-landscaping>)

[

### Utilities

Quantity surveying and claims support for utility installations, diversions, connections and associated civil works.



](<https://www.quantsurv.com/sectors/infrastructure/utilities>)

[

### Water networks

Quantity surveying and claims support for water mains, pumping stations, storage and supply infrastructure.



](<https://www.quantsurv.com/sectors/infrastructure/water-networks>)
