# Sectors

Quantity surveying, claim and dispute support across building, energy, infrastructure and specialist construction sectors.

## What changes the commercial picture

The conditions around the work shape its cost as much as the quantities. Access, existing operations, the information available and the way packages fit together all affect what needs pricing and recording. These checks help you identify where your project needs closer attention.

Access and continued use

Work in an occupied building or operating facility may need phased access, protection and repeated setup. Check the working hours and areas assumed in the price. Record actual access and interruptions during delivery so their effect can be assessed.

Existing conditions and incomplete information

Hidden services, retained structures and developing designs can change the work required. Identify which surveys and drawing revisions the price relies on, what remains an allowance and who will resolve each uncertainty. Record what is found before the work covers it up.

The boundaries between packages

Supply, installation, connections and testing may sit with different firms. Check who provides each part, who needs to finish first and who makes good afterwards. An item omitted by both packages can become an extra cost; an item included twice can distort the budget.

Testing and handover

Finishing the installation may leave testing, demonstrations and handover records outstanding. Check what the agreed completion requirements include, whose attendance is needed and how these activities are priced and programmed. Keep progress records against those requirements.

## Explore our sectors

Explore the construction types and commercial considerations within each sector.

[

### Energy

Generation, renewables, storage and electricity networks.



](<https://www.quantsurv.com/sectors/energy>)

[

### Industrial

Factories, warehouses and construction within operating facilities.



](<https://www.quantsurv.com/sectors/industrial>)

[

### Infrastructure

Civil engineering, utilities, drainage and enabling works.



](<https://www.quantsurv.com/sectors/infrastructure>)

[

### Marine

Ports, harbours, coastal works and waterside construction.



](<https://www.quantsurv.com/sectors/marine>)

[

### Mining

Mine development, site infrastructure and associated construction.



](<https://www.quantsurv.com/sectors/mining>)

[

### Oil and gas

Facility construction, pipelines, upgrades and shutdown work.



](<https://www.quantsurv.com/sectors/oil-and-gas>)

[

### Processing

Process plants, treatment facilities and production upgrades.



](<https://www.quantsurv.com/sectors/processing>)

[

### Public and community buildings

Education, healthcare, civic, cultural and leisure buildings.



](<https://www.quantsurv.com/sectors/public-and-community>)

[

### Refurbishment and retrofit

Fit-out, alterations, heritage, remediation and energy improvements.



](<https://www.quantsurv.com/sectors/refurbishment-and-retrofit>)

[

### Residential and commercial

Homes, workplaces, shops, hospitality and mixed-use developments.



](<https://www.quantsurv.com/sectors/residential-and-commercial>)

[

### Transportation

Road, rail and airport construction and associated assets.



](<https://www.quantsurv.com/sectors/transportation>)

## When your project spans several sectors

A warehouse extension might combine industrial work, refurbishment of occupied offices and a new energy installation. Each part brings different constraints. Use the relevant sector pages together, then identify where one package depends on another.

For each significant constraint, keep a short record of the pricing assumption, responsible party, decision date and supporting information. If the assumption changes, record the event and its effect on the work. The contract and project records then provide the basis for assessing the commercial position.