# CDP (Contractor's Designed Portion): definition and example

The part of a JCT building contract that the contractor designs.

By [Jack Butler-Kettle](<https://www.quantsurv.com/about#who-we-are>) · Updated 30 September 2026

Guidance for England and Wales. Check the contract, amendments and facts that apply to your job.

## What it means in practice

Read this alongside [JCT Design and Build Contract 2016: Simply Fair](<https://corporate.jctltd.co.uk/jct-design-and-build-contract-2016-simply-fair/>).

A Contractor's Designed Portion identifies design work allocated to the contractor within the relevant JCT arrangement. A subcontractor's duties depend on what its own appointment passes down. Design development, coordination and responsibility for specified performance may involve different obligations.

Compare the design scope with qualifications and insurance requirements. A [pre-signing contract review](<https://www.quantsurv.com/contract-review/services/pre-signing-contract-review>) can highlight obligations needing agreement before design starts.

## Worked example

### The facts

A specialist is asked to design a staircase connection while the main structure is designed by others.

### What happens

1.  It records the design interfaces and the information it will rely on.
    
2.  It checks whether its subcontract requires connection design only or a wider performance obligation.
    

### What this shows

The scope of responsibility follows the agreed documents, rather than the CDP label alone.

## Sources

1.  [JCT Design and Build Contract 2016: Simply Fair (12 July 2017)](<https://corporate.jctltd.co.uk/jct-design-and-build-contract-2016-simply-fair/>). The Joint Contracts Tribunal.