Source: https://www.quantsurv.com/quantity-surveying/subcontractors/subcontract-cost-reporting-and-cost-value-reconciliation
Content format: Markdown version of the public page.
Content reviewed: 2026-10-19

# Subcontract cost reporting and cost value reconciliation

For subcontractors

See the forecast result of your package by reconciling costs, value, changes and work still to complete.

## What is it?

We focus on package margin, labour and procurement exposure, including the distinction between claimed and supportable value. A commercial reporting setup or a report for one agreed period. Setup establishes the project’s reporting structure and opening position; each later reporting cycle is separately instructed or covered by an agreed retainer.

Historic data reconstruction, additional projects and subsequent periods require their own instruction or an agreed retainer allowance.

## How does it work?

1.  ### You explain the work and the decision you need
    
    You describe your trade package and the contractor who appointed you, the result you need and any urgent dates. The introductory conversation checks fit and availability; substantive assessment starts under an accepted instruction.
    
2.  ### We agree the scope, responsibilities and fee
    
    We check suitability, conflicts and capacity, then agree the scope, deliverables and timetable in writing, with a fixed fee or agreed hourly or daily basis. We explain payment terms, VAT and any separate costs before you accept. We agree the report period, cost boundaries, cut-off and reporting frequency. Recurring reports require an agreed ongoing scope. We confirm responsibility for urgent actions and specialist input.
    
3.  ### You accept the scope and provide the information
    
    You accept the written scope and provide the approved budget, cost codes, orders and commitments, transactions, payment and valuation records, change register, programme and remaining-work forecast. You identify missing items and the versions supplied; we agree who will obtain anything still needed.
    
4.  ### We check the records and resolve gaps
    
    We check the documents against the agreed scope, dates and versions, raise queries and record the basis on which work can proceed. Missing evidence stays identified; we agree any limited assessment or pause affected work until essential information is available. Live deadlines continue to run.
    
5.  ### We reconcile the reporting position
    
    We check opening balances, current transactions, commitments and accruals against the source records and previous report. We distinguish payments from cost incurred and investigate unexplained movements.
    
6.  ### We forecast cost, value and margin
    
    We reconcile recognised value with the contract and assessed changes, test remaining costs and show forecast margin. We identify unsupported recovery assumptions and distinguish commercial value from expected cash receipts.
    
7.  ### We check and explain the movements
    
    We check totals, allocations, duplication and consistency with the previous report. We explain material variances, sensitivities and decisions that could change the forecast.
    
8.  ### You agree the actions and reporting baseline
    
    You confirm factual corrections and choose actions on procurement, scope or expenditure. We record the approved baseline and responsible people; the next reporting cycle starts only if included in your instruction.
    
9.  ### We explain the result and complete the handover
    
    We issue the cost and value reconciliation, forecast and action list, explain the findings and record unresolved items, next actions, owners and dates. We answer the included clarification and correct our errors. New information, changed scope and later stages need a separate agreement; you decide whether to instruct them.
    

We confirm timing after checking the scope and available records. Flag any live deadline when you enquire; it continues to run while information is gathered.

Read [how we agree the scope, fees and instruction](<https://www.quantsurv.com/about#ways-to-work>).

## What do you get?

You receive the outputs for the stages you choose. Each stage has its own scope, fee and endpoint; later stages are optional.

-   Setup: reporting structure, opening reconciliation, data responsibilities and a handover session.
-   Reporting cycle: cost report or CVR, explained movements, forecast assumptions and decisions required.

Each fixed piece of work includes one consolidated clarification round requested within 10 working days of issue, unless agreed otherwise. New records or scope need a separate agreement; we correct our own errors without charge.
