# How do JCT fluctuation provisions (Options A, B and C) work?

They apply only if your contract selects a fluctuations option, and then only by that option's method, from its base date, for what it covers.

by [Jack Butler-Kettle](<https://www.quantsurv.com/about#jack-butler-kettle>), MCIArb, NEC Registered Adjudicator · Last reviewed 10 October 2026 · About 2 min readShare

## The answer

Fluctuation adjustments depend on the option and edition actually incorporated into your contract, including amendments and completed data. Do not assume that an option in the main contract also applies to your package.

JCT Option A principally concerns changes to specified contributions, levies and taxes; Option B provides a cost-based route covering specified labour, materials and other items; Option C uses formula rules and published indices. Check the particular form's available provisions, definitions and calculation rules. JCT publishes its [Fluctuations Options A, B and C 2024](<https://www.jctltd.co.uk/useful-documents/fluctuations-options-a-b-and-c-2024>) separately.

Identify the contractual base date or base period, eligible work, basic prices or indices, coefficients and non-adjustable portions. Read the actual notice and information conditions and any treatment of work after completion or an extended completion date. A supplier's percentage increase does not replace the selected contractual method.

Show each assessment period, the eligible value or cost, the calculation inputs and the adjustment already assessed. Reconcile variations and other price-rise claims to avoid paying the same movement twice.

Our [Commercial management and cost reporting](<https://www.quantsurv.com/quantity-surveying#client-types>) tracks the baseline and evidence for adjustments permitted by the selected JCT provisions.

## Sources

1.  [Fluctuations Options A, B and C 2024](<https://www.jctltd.co.uk/useful-documents/fluctuations-options-a-b-and-c-2024>). The Joint Contracts Tribunal.

[Browse changes and extra costs in the Library](<https://www.quantsurv.com/library#topic-changes>)

[Browse the Library](<https://www.quantsurv.com/library>)