Source: https://www.quantsurv.com/liquidated-damages/tips/liquidated-damages-cap
Content format: Markdown version of the public page.
Content reviewed: 2026-10-10

# Check liquidated damages for a cap and a comparison

Before you sign, multiply the weekly liquidated damages rate by a realistic worst-case delay and compare it with your margin. If the answer is more than the job earns and there is no cap, treat the exposure as a major negotiation point alongside the other material risks.

by [Jack Butler-Kettle](<https://www.quantsurv.com/about#jack-butler-kettle>), MCIArb, NEC Registered Adjudicator · Last reviewed 10 October 2026 · About 2 min readShare

## Why

A weekly rate of delay damages can look small on the page. People read it as a number, not as a multiple. Nobody signs a clause saying the delay risk is bigger than the profit. They sign one that says £4,000 a week, and never do the sum. Without a cap, a long overrun from a chain of events you only partly control can eat the margin and then the contract sum. Setting the rate against your margin turns the clause from a legal point into a commercial one. And a commercial point is something your estimator and your board can weigh.

## How do I do it?

1.  Multiply the weekly rate by a realistic worst-case delay for this kind of job, not the best case.
2.  Set the result beside the expected margin, and write both numbers on your contract review summary.
3.  Prioritise an appropriate cap where the exposure is unacceptable, while checking its scope, exclusions and interaction with other liabilities. Ask for it as a percentage of the contract sum.
4.  Record the agreed rate and cap in the working summary, so the site team knows what a week costs.

Our [Completion-date and notice tracking setup](<https://www.quantsurv.com/claims#client-types>) identifies the stated rate, cap and conditions that determine commercial exposure to delay damages.

[Browse delay and disruption in the Library](<https://www.quantsurv.com/library#topic-delay>)

[Browse the Library](<https://www.quantsurv.com/library>)
