# Referral notice

The referring party’s case and evidence in an adjudication; if you are responding, check the timetable you receive and seek prompt advice.

by [Jack Butler-Kettle](<https://www.quantsurv.com/about#jack-butler-kettle>) · About 3 min readShare

## Further detail

Read this alongside [paragraph 7 of Part I of the Scheme for Construction Contracts (England and Wales) Regulations 1998](<https://www.legislation.gov.uk/uksi/1998/649/schedule/part/I/paragraph/7>).

The referral presents the referring party's case, remedy and evidence in an adjudication. It should be consistent with the dispute identified in the notice of adjudication. A respondent needs to understand the actual directions and timetable rather than assume a standard response period from general guidance.

Organise documents against the issues and obtain prompt procedural advice. [Claim assessment and response](<https://www.quantsurv.com/claims?service=%2Fclaims-against-you%2Fservices%2Fcounterclaim-defence#client-types>) can support the underlying response within an agreed scope; formal representation requires confirmation.

## Sources

1.  [Scheme for Construction Contracts (England and Wales) Regulations 1998, SI 1998/649, Schedule, Part I, para 7 (Referral of the dispute)](<https://www.legislation.gov.uk/uksi/1998/649/schedule/part/I/paragraph/7>). legislation.gov.uk.

### Formal communication preparation pack

Use these original fictional preparation records to organise the evidence and obtain advice on the actual procedure. They are not universal notices to serve.

[Download blank Word template](<https://www.quantsurv.com/downloads/library/formal-communication-preparation-pack.docx>)

Free blank template for your own project. The completed example is shown below. No email address required.

View the completed example

Completed fictional example

Westhaven refurbishment · 14 October 2026 · Version 1.0

#### Dispute notice preparation

Scroll across if needed to read the whole record. A dash means no value has been entered.

Dispute notice preparation: completed fictional example
| Field | Completed fictional record |
| --- | --- |
| Parties and contract | Westhaven Interiors and Alder Mere Projects; order WH-042 |
| Dispute | £2,000 September assessment difference, rejected in response C-11 |
| Relief sought | Payment of the substantiated balance; interest basis to be checked |
| Documents | APP-09, PN-09, C-09 and C-11; bank record B-17 |
| Procedure | Identify applicable adjudication terms, nominating route and service requirements before issuing |

#### Suspension review

Scroll across if needed to read the whole record. A dash means no value has been entered.

Suspension review: completed fictional example
| Check | Completed fictional record |
| --- | --- |
| Payment position | £2,000 assessed balance unpaid; application difference tracked separately |
| Prerequisites | Payment obligation, final date and any pay less notice to be reviewed |
| Proposed action | No suspension date authorised; review notice period and service first |
| Operational plan | Record affected work, safe handover and restart implications |

#### Termination review

Scroll across if needed to read the whole record. A dash means no value has been entered.

Termination review: completed fictional example
| Check | Completed fictional record |
| --- | --- |
| Alleged ground | Repeated access obstruction alleged; contract ground not yet established |
| Sequence | Review breach notice, remedy opportunity and termination steps separately |
| Authority | Decision and wording require authorised review before any notice |
| Evidence / account | Preserve correspondence, programme, work/property inventory and payment account |

These preparation examples deliberately stop before a legal act. The applicable contract, governing law and facts determine the required content, procedure and consequences.