# Collateral warranty

A separate contract in which you promise a third party, such as a funder or a tenant, that you have met your contract duties.

by [Jack Butler-Kettle](<https://www.quantsurv.com/about#jack-butler-kettle>) · About 2 min readShare

## Further detail

A collateral warranty creates a contractual relationship with someone outside the original contract, such as a tenant or funder. It may cover design or workmanship duties, assignment and other rights. Its wording can affect the duration and extent of exposure, so it should be read with the subcontract.

Check consistency, liability limits and insurance with appropriate advisers. A [Construction contract review before signing](<https://www.quantsurv.com/quantity-surveying?service=%2Fcontract-review%2Fservices%2Fpre-signing-contract-review#client-types>) can identify commercial differences requiring specialist legal attention.

### Contract and security document register

Obtain authorised documents from the publisher or relevant party. Use the register to track them; it does not reproduce or supply a standard contract.

[Download blank Excel workbook](<https://www.quantsurv.com/downloads/library/contract-and-security-document-register.xlsx>)

Free blank template for your own project. The completed example is shown below. No email address required.

View the completed example

Completed fictional example

Westhaven refurbishment · 14 October 2026 · Version 1.0

#### Contract and security document register

Scroll across if needed to read the whole record. A dash means no value has been entered.

Contract and security document register: completed fictional example
| Document | Form / edition | Parties / beneficiary | Execution / expiry | Review question | Source / status |
| --- | --- | --- | --- | --- | --- |
| Main contract | Selected JCT form and edition to be confirmed | Employer / contractor | Signed copy required | Check particulars, amendments and incorporated documents | Obtain licensed copy from JCT |
| Collateral warranty | Project-specific agreed draft | Subcontractor / named beneficiary | Execution pending | Check duty, liability limit, assignment and step-in provisions | Obtain agreed draft from project team |
| Performance bond | Bond provider draft | Contractor / employer | Expiry and claim conditions to be verified | Check trigger, amount and required demand documents | Obtain provider-issued instrument |

The download is an original document-control register. Copyright standard contracts, warranties and bonds must be obtained through authorised sources and reviewed for the project.

-   [JCT contract families](<https://www.jctltd.co.uk/category/contracts>)
-   [NEC contracts](<https://www.neccontract.com/products/contracts>)
-   [FIDIC contracts](<https://fidic.org/bookshop>)

[Browse the Library](<https://www.quantsurv.com/library>)