Source: https://www.quantsurv.com/library/definitions/prime-cost-sum
Content format: Markdown version of the public page.
Content reviewed: 2026-10-12

# Prime cost sum

In RICS NRM 2, an allowance within a unit rate for the supply of specified materials or goods, with other rate components dealt with separately.

by [Jack Butler-Kettle](<https://www.quantsurv.com/about#jack-butler-kettle>) · About 1 min readShare

## Further detail

Read this alongside [NRM 2: Detailed measurement for building works](<https://www.rics.org/content/dam/ricsglobal/documents/standards/NRM-2_Oct2022_Update.pdf>).

A prime cost sum in RICS NRM 2 is a supply allowance within a unit rate, such as a tile allowance per square metre. Labour, fixing materials and other rate components must be identified separately. Terminology can differ between documents, so establish the definition used in your own contract before comparing prices.

Record the supply allowance, selection, quantity, wastage basis and other rate components. The [bill of quantities guide](<https://www.quantsurv.com/library/bill-of-quantities-example>) explains how quantities and rates fit together. Our [quantity surveying services](<https://www.quantsurv.com/quantity-surveying>) can help identify rate components and explain the commercial effect of a changed selection.

## Sources

1.  [NRM 2: Detailed measurement for building works, UK 2nd edition, October 2021 (reissued October 2022 as RICS practice information)](<https://www.rics.org/content/dam/ricsglobal/documents/standards/NRM-2_Oct2022_Update.pdf>). RICS.

[Browse the Library](<https://www.quantsurv.com/library>)
