# Fee (NEC)

In an NEC contract, the amount calculated by applying the contractual fee percentage to Defined Cost, distinct from the percentage itself.

by [Jack Butler-Kettle](<https://www.quantsurv.com/about#jack-butler-kettle>) · About 1 min readShare

## Further detail

Read this alongside [the NEC Dictionary of Terms](<https://www.neccontract.com/resources/dictionary>).

In NEC terminology, Fee is calculated using the applicable contractual percentage and cost basis. It should be distinguished from a consultant's professional fee and from amounts already included in Defined Cost. The form, option and amendments govern the calculation and avoid double counting.

Show the cost basis and Fee separately. Our [Change valuation and compensation-event quotations](<https://www.quantsurv.com/quantity-surveying?service=%2Fquantity-surveying%2Fvariations-compensation-events#client-types>) service presents a quotation with traceable components and assumptions under the selected NEC terms.

## Sources

1.  [NEC Dictionary of Terms](<https://www.neccontract.com/resources/dictionary>). NEC Contracts.