Source: https://www.quantsurv.com/
Content format: Markdown version of the public page.
Content reviewed: 2026-10-13

Interactive forms, calculators and booking actions require the linked web page. Any displayed calculation is the page's initial example, not a calculation for your circumstances.

# Quantity surveying, claim & dispute resolution services for the UK construction industry

[Jack Butler-Kettle](<https://www.quantsurv.com/about#jack-butler-kettle>)[LinkedIn](<https://www.linkedin.com/in/jack-butler-kettle>)

## Get in touch

Name

Email address

Company or trading name (optional)

Phone number (optional)

Message

## [Quantity Surveying](<https://www.quantsurv.com/quantity-surveying>)

[

### Pre-contract and post-contract

Plan, procure and manage the commercial work of your construction project.



](<https://www.quantsurv.com/quantity-surveying>)

## [Claims & Disputes](<https://www.quantsurv.com/claims>)

[

### Resolution and prevention

Assess, prepare and respond to construction claims and disputes, or put measures in place to help prevent them.



](<https://www.quantsurv.com/claims>)

## [Sectors](<https://www.quantsurv.com/sectors>)

[

### Energy

Generation, renewables, storage and electricity networks.



](<https://www.quantsurv.com/sectors/energy>)

[

### Industrial

Factories, warehouses and construction within operating facilities.



](<https://www.quantsurv.com/sectors/industrial>)

[

### Infrastructure

Civil engineering, utilities, drainage and enabling works.



](<https://www.quantsurv.com/sectors/infrastructure>)

[

### Marine

Ports, harbours, coastal works and waterside construction.



](<https://www.quantsurv.com/sectors/marine>)

[

### Mining

Mine development, site infrastructure and associated construction.



](<https://www.quantsurv.com/sectors/mining>)

[

### Oil and gas

Facility construction, pipelines, upgrades and shutdown work.



](<https://www.quantsurv.com/sectors/oil-and-gas>)

[

### Processing

Process plants, treatment facilities and production upgrades.



](<https://www.quantsurv.com/sectors/processing>)

[

### Public and community buildings

Education, healthcare, civic, cultural and leisure buildings.



](<https://www.quantsurv.com/sectors/public-and-community>)

[

### Refurbishment and retrofit

Fit-out, alterations, heritage, remediation and energy improvements.



](<https://www.quantsurv.com/sectors/refurbishment-and-retrofit>)

[

### Residential and commercial

Homes, workplaces, shops, hospitality and mixed-use developments.



](<https://www.quantsurv.com/sectors/residential-and-commercial>)

[

### Transportation

Road, rail and airport construction and associated assets.



](<https://www.quantsurv.com/sectors/transportation>)

## [Support](<https://www.quantsurv.com/support>)
