Source: https://www.quantsurv.com/fixed-price/estimate
Content format: Markdown version of the public page.
Content reviewed: 2026-11-21

# Estimate

Your measured quantities priced

Have measured quantities priced into an estimate you can check, with every rate and allowance shown.

£450

One-off payment · No VAT charged

Delivered by email within **5 working days**

[Start your order](<https://www.quantsurv.com/fixed-price/estimate/order>)

## What you get

-   Priced schedule with a rate and total for each item
-   Preliminaries, overheads, profit and risk shown separately
-   Assumptions, exclusions and provisional items

## What we need from you

-   Bill of quantities or item schedule
-   Specification or item descriptions
-   Programme and site constraints (optional)

by Jack Butler-Kettle · A quantity surveyor directs and checks every output, with AI used for speed and reasonable prices

Full scope and limits

## What it covers

An estimate for one work package or small project in the UK, priced from the quantities you supply. We price each item, add preliminaries, overheads, profit and risk as separate stated allowances, and identify the assumptions the estimate rests on.

## What to send

-   The measured quantities: a bill of quantities or a schedule of items with units and quantities.
-   The specification or description that fixes the quality of each item.
-   The project location, the programme period and any site constraint that affects price.
-   Whether the estimate is a cost or a selling price, and the allowances you want applied.

## Your completed output

-   A priced schedule with a rate and total for each item.
-   Preliminaries, overheads, profit and risk shown as separate stated allowances.
-   A list of assumptions, exclusions and items priced as provisional.

## Scope and limits

-   One package or small project, with up to 60 pages across the complete submission. Quantities must be supplied: measurement from drawings is not included.
-   Rates are current market rates at the date of issue for the stated location. They are not quotations and are not guaranteed.
-   The estimate is for budgeting and checking. Tendering the work and obtaining supplier quotations are separate work.

[Working terms](<https://www.quantsurv.com/fixed-price/working-terms>)
