# Tie every line to a document

Link each final-account item to the records supporting its basis and amount. Where a record is missing, explain the gap and consider what other evidence is available.

by [Jack Butler-Kettle](<https://www.quantsurv.com/about#jack-butler-kettle>), MCIArb, NEC Registered Adjudicator · Last reviewed 10 October 2026 · About 2 min readShare

## Why

The surveyor on the other side is looking for the line that lets them discount the whole account. They find it in the variation with no instruction, the quantity from the foreman's memory, or the rate lifted from another job. Once one line is shown to be unsupported, every other line is read as if it might be. The offer that follows is priced on that suspicion. A document behind every line removes the shortcut. They have to attack the account item by item, and item by item is where good records win.

## How do I do it?

1.  Add a document reference column to the account and fill it for every line before anything else.
2.  Reference each variation's instruction by date and number, or the email confirming a verbal one.
3.  Reference each quantity to the measure sheet, drawing or delivery record it comes from.
4.  Reference each rate to its line in the contract schedule or to a dated build-up.
5.  Investigate any missing reference, including available witness or other evidence. Explain uncertainty and decide deliberately whether to pursue, qualify, reserve or withdraw the item.

Our [Final account preparation and assessment](<https://www.quantsurv.com/quantity-surveying#client-types>) links each account item to the records that support its quantity, rate and entitlement.

[Browse completion and contract endings in the Library](<https://www.quantsurv.com/library#topic-completion>)

[Browse the Library](<https://www.quantsurv.com/library>)