# Structure it by heads, not by grievance

Split your final account into separate heads, because an account that reads as one long complaint gets one short reply. Measured work, variations, loss and expense, retention and disputed set-offs each have their own basis and their own evidence, and each deserves an answer on its own terms.

by [Jack Butler-Kettle](<https://www.quantsurv.com/about#jack-butler-kettle>), MCIArb, NEC Registered Adjudicator · Last reviewed 9 October 2026 · About 2 min readShare

## Why

Send one long grievance and the other party answers it in one paragraph: the job overran, your costs are your own, claim not accepted. That is easy, because your account never told them what to accept. Measured work needs a measure. A variation needs its instruction. Loss and expense needs its event and its cost. A disputed set-off needs the notice that was or was not sent. Run those together and the weakest evidence drags down the strongest. Nobody can pay one line without seeming to concede the rest. Separate heads make part agreement possible, and that is how accounts actually settle.

## How do I do it?

1.  List the heads your contract recognises: measured work, variations, provisional sums, loss and expense, retention, and the set-offs you dispute.
2.  Put each item under one head only, and note which clause or record supports that head.
3.  Give each head its own summary sheet with the sum claimed, the sum certified and the difference.
4.  Write the explanation for each head separately, in the order the contract adjusts the sum.
5.  Put a one-page summary at the front that adds the heads up to the total claimed.

Our [Final account close-out process setup](<https://www.quantsurv.com/claims#client-types>) separates the disputed account into defined items with their own basis and calculation.

If the account is already one pile, see [what to do when the final account is due and your position needs checking](<https://www.quantsurv.com/final-accounts/problems/building-your-position>).

[Browse completion and contract endings in the Library](<https://www.quantsurv.com/library#topic-completion>)

[Browse the Library](<https://www.quantsurv.com/library>)