# Let the records set the claim's size

Build the amount claimed from supportable loss and the applicable valuation rules. Explain gaps and estimates rather than increasing a figure to create negotiating room.

by [Jack Butler-Kettle](<https://www.quantsurv.com/about#jack-butler-kettle>), MCIArb, NEC Registered Adjudicator · Last reviewed 9 October 2026 · About 2 min readShare

## Why

A figure picked first turns your team into its defenders. Every record that supports it is kept, every record against it is explained away, and the gaps are filled with guesses. The other party's surveyor will call that padding. It usually shows, because it looks different from the parts with evidence behind them, and once found it drags the whole claim down. A figure that comes out of the records is smaller, sometimes much smaller. Even a well-evidenced figure still needs entitlement, causation and the correct valuation basis. Identify remaining assumptions and weaknesses openly.

## How do I do it?

1.  Read the records before anyone names a target figure, and agree with your directors that the figure comes at the end.
2.  List the events and costs the records actually show, with the document behind each.
3.  Value only what the records show, and keep a separate note of what might exist but cannot be proved.
4.  Present the figure with its evidence, and explain to your directors why it is that figure.
5.  Push back on any instruction to add to the figure without a record to support it.

Our [Delay and disruption cost recovery](<https://www.quantsurv.com/claims/delay-and-disruption-cost-recovery>) builds the financial assessment from supported quantities, periods and costs rather than a desired claim total.

[Browse delay and disruption in the Library](<https://www.quantsurv.com/library#topic-delay>)

[Browse the Library](<https://www.quantsurv.com/library>)