Source: https://www.quantsurv.com/delay-and-disruption/tips/record-the-ordinary-days
Content format: Markdown version of the public page.
Content reviewed: 2026-10-07

# Record the ordinary days too

Record normal progress as well as disrupted work. A reliable comparison can help assess an alleged loss of productivity, alongside the other available evidence.

by [Jack Butler-Kettle](<https://www.quantsurv.com/about#jack-butler-kettle>), MCIArb, NEC Registered Adjudicator · Last reviewed 7 October 2026 · About 2 min readShare

## Why

A disruption claim is a comparison: what the gang did on a normal day against what it did on a disrupted one. If the diary only records bad days, a reliable comparison may need other records or a different analysis. The ordinary entries show output when nothing went wrong, so the shortfall in the bad weeks can be measured, not just claimed. They also show the diary was a routine, kept whether or not anything happened. That is what makes the disrupted entries believable.

## How do I do it?

1.  Set a short template for every day: weather, labour by trade, plant on site, areas worked, output, visitors and instructions.
2.  Fill it in every working day, quiet ones included, and write normal output rather than leaving the line blank.
3.  Record output in the claim's units, such as metres, square metres, fixings or pours, so good weeks can be set against bad ones.
4.  Keep ordinary and disrupted entries in the same diary and the same format, so nothing looks added later.

Our [Construction contract management](<https://www.quantsurv.com/quantity-surveying#client-types>) preserves normal output as well as disrupted work, helping a later assessment test fair comparisons.

[Browse delay and disruption in the Library](<https://www.quantsurv.com/library#topic-delay>)

[Browse the Library](<https://www.quantsurv.com/library>)
