# Close gaps while the facts are warm

Check records regularly and investigate gaps while people remember the work. Preserve the original and label any later reconstruction rather than presenting it as a same-day record.

by [Jack Butler-Kettle](<https://www.quantsurv.com/about#jack-butler-kettle>), MCIArb, NEC Registered Adjudicator · Last reviewed 7 October 2026 · About 2 min readShare

## Why

A gap in the record is two problems, and the second grows every week. The first is the missing fortnight itself. The second is that the people who could fill it are moving on. The foreman goes to another job, the phone with the photos gets replaced, and the supplier archives its delivery notes. A statement written a month later by someone who was there, dated and open about being written later, still has value. A statement made much later still needs a fair assessment of the witness's knowledge, reliability and corroborating records; its date alone does not make it a guess.

## How do I do it?

1.  List what is missing when the monthly check finds a gap, and who was on site at the time.
2.  Sit each of them down within the week and take a dated statement of what they remember, in their own words.
3.  Head every statement with the date it was written and a line saying it was made from memory after the event.
4.  Gather whatever else survives from the period, such as phone photos, delivery notes and messages, and file it with the statements.

Our [Construction contract management](<https://www.quantsurv.com/quantity-surveying#client-types>) identifies incomplete records early and records corrections without disguising retrospective recollections as original evidence.

To find those gaps while they can still be filled, see [how a monthly check finds the gaps while the month can still be rebuilt](<https://www.quantsurv.com/claims#client-types>).

[Browse delay and disruption in the Library](<https://www.quantsurv.com/library#topic-delay>)

[Browse the Library](<https://www.quantsurv.com/library>)