# I want my claim tested before the other party sees it

The claim is written, or half written, and I want to know where it will be attacked before it goes in.

by [Jack Butler-Kettle](<https://www.quantsurv.com/about#jack-butler-kettle>), MCIArb, NEC Registered Adjudicator · Last reviewed 11 October 2026 · About 2 min readShare

## What does this mean for me?

A finished or half-finished claim is worth a hostile read before it goes in. That matters most when the people who built it are close to the figures. Check the arithmetic, the rates and their sources, the quantities, the allocation, any overlap between heads and the records behind each significant head. Check that each event was notified as the contract requires.

The review should separate a confirmed error in a calculation from a limit of the sample or an evidence gap still open. It helps you decide. It does not predict whether the claim will survive challenge, and it is not a neutral decision on a dispute.

While the claim is still inside your business, you can reshape it freely: drop heads, repair records, rebuild figures. Once a figure has gone to the other party, even informally, every change has to be explained. So the test is worth most before anything is sent.

## What do I need to do?

1.  Review the claim head by head against the contract and original evidence.
2.  Log duplicated costs, uncertain quantities, unsupported rates and contradictory records separately.
3.  Give each finding an owner and a correction or evidence request.
4.  Reconcile the revised total and mark each item corrected, supported, conditional or unresolved before deciding what to submit.

To have this done for you, see our [Delay and disruption cost recovery](<https://www.quantsurv.com/claims/delay-and-disruption-cost-recovery>) service.