Source: https://www.quantsurv.com/delay-and-disruption/problems/sent-off-site
Content format: Markdown version of the public page.
Content reviewed: 2026-10-11

# I've been sent off site and told to come back when it's ready

The area wasn't ready, the gang was sent away, and now we're paying to leave, come back and pick up where we left off.

by [Jack Butler-Kettle](<https://www.quantsurv.com/about#jack-butler-kettle>), MCIArb, NEC Registered Adjudicator · Last reviewed 11 October 2026 · About 2 min readShare

## What does this mean for me?

The other party tells you to leave an area, or the site, until it is ready. The slab is late, the scaffold is not up, or the trade before you is behind. The gang goes to another job or goes home. Plant is taken away or left standing. When the call comes to return, nobody writes down how long it takes to get back up to speed.

Whether you can get that cost back depends on your contract. It turns on the route it gives for the event and the notice it requires. It also turns on how it values the extra cost, whether it calls it loss and expense or something else. Then you have to show the facts. Who told you to leave, and when? What went off site and what stayed? What did it cost to come back? How long did the gang take to reach its old output?

Every part of that cost is real. But none of it shows as one line anyone can point to. If nobody records it, it disappears into your labour and hire costs.

## What do I need to do?

1.  Record the instruction to leave, who gave it, when and why.
2.  Log labour, plant and materials removed or left on site and the associated ongoing commitments.
3.  Give any required notice through the contractual route within the actual period.
4.  Record mitigation and remobilisation separately, linking each supported cost to the event rather than assuming every cost is recoverable.

To have this done for you, see our [Delay and disruption cost recovery](<https://www.quantsurv.com/claims/delay-and-disruption-cost-recovery>) and [Delay and disruption records setup](<https://www.quantsurv.com/claims#client-types>) services.

[Browse delay and disruption in the Library](<https://www.quantsurv.com/library#topic-delay>)

[Browse the Library](<https://www.quantsurv.com/library>)
