# Where do delay and disruption claim valuations usually fail?

They usually fail on quantities, rates, how costs are split, arithmetic, double counting or the valuation basis, so test each one.

by [Jack Butler-Kettle](<https://www.quantsurv.com/about#jack-butler-kettle>), MCIArb, NEC Registered Adjudicator · Last reviewed 12 October 2026 · About 1 min readShare

## The answer

Quantum claims usually fail on quantities, rates, how costs are split, arithmetic, double counting or the valuation basis, so test each one.

Ask these questions of every head. Does each rate have a source? Can the quantities be measured? Are the preliminaries built up from real costs, or just added as a percentage with nothing behind it? Does the same cost appear under two heads? Does a global total, one lump sum for everything, separate the different causes?

A clear trail back to the sources helps. But it does not prove you are owed the money, and it does not fill a gap in the evidence. Write down each weakness and the decision it affects. Some gaps may stay open, or may need a different method, input from the contract or a specialist.

To have each head of your claim stress-tested before it goes to the other party, see our [Delay and disruption cost recovery](<https://www.quantsurv.com/claims/delay-and-disruption-cost-recovery>) service.

[Browse delay and disruption in the Library](<https://www.quantsurv.com/library#topic-delay>)

[Browse the Library](<https://www.quantsurv.com/library>)