# What is quantum in a delay and disruption claim?

Quantum is the money side of a claim: the amount worked out on the valuation basis that applies.

by [Jack Butler-Kettle](<https://www.quantsurv.com/about#jack-butler-kettle>), MCIArb, NEC Registered Adjudicator · Last reviewed 25 September 2026 · About 2 min readShare

## The answer

Quantum is the money side of a claim: the amount worked out on the valuation basis that applies. It can cover varied work, disruption, prolongation or other money heads. Prolongation is the extra cost of being on site for longer.

Each head needs a stated basis. It also needs records that support its quantities, rates and periods, and how its costs are split. The figure may use measured work, contract rates, costs backed by records or suitable forecasts. Whatever it uses, the calculation must show its sources and assumptions, and how it links to what is being claimed.

Delay analysis is separate work: it looks at the programme and at time. The period of delay should come from the right specialist or from agreed project records.

A checked claim shows what the evidence supports, what still depends on other inputs and what cannot yet be separated out. It does not predict what will be awarded or what you will collect.

Our [Delay and disruption cost recovery](<https://www.quantsurv.com/claims/delay-and-disruption-cost-recovery>) service values each head from the records and builds the checked claim.

[Browse delay and disruption in the Library](<https://www.quantsurv.com/library#topic-delay>)

[Browse the Library](<https://www.quantsurv.com/library>)