Source: https://www.quantsurv.com/delay-and-disruption/faq/head-office-overheads
Content format: Markdown version of the public page.
Content reviewed: 2026-10-10

# How are head office overheads claimed? Hudson, Emden and Eichleay

Start with evidence of the overhead loss and the right to recover it. A formula may assist in suitable circumstances, but is not a substitute for proving the loss or checking for double counting.

by [Jack Butler-Kettle](<https://www.quantsurv.com/about#jack-butler-kettle>), MCIArb, NEC Registered Adjudicator · Last reviewed 10 October 2026 · About 2 min readShare

## The answer

Start by distinguishing two different losses. Additional head office expenditure is an actual extra cost caused by the event, such as supported additional management time. Unabsorbed overhead or lost contribution concerns capacity tied up without earning the contribution it could otherwise have earned. A record of director time does not automatically prove both heads.

Establish the contractual or other legal basis, compensable cause and period, mitigation and evidence linking the loss to the event. For an opportunity-loss case, examine available work, capacity, prospects of obtaining and performing it, and the contribution actually lost. An extension of time and one declined tender are not sufficient by themselves.

Hudson uses a tender overhead-and-profit percentage, Emden an accounts-derived percentage, and Eichleay an allocation of actual overheads and turnover. These formulas depend on different assumptions; their outputs are not interchangeable with actual additional costs. Our [head office overheads calculator](<https://www.quantsurv.com/library/tools/head-office-overheads-calculator>) shows the arithmetic. The [SCL Delay and Disruption Protocol](<https://www.scl.org.uk/sites/default/files/documents/SCL_Delay_Protocol_2nd_Edition_Final.pdf>) discusses the evidential limits and does not recommend Hudson.

Choose a supported assessment basis and reconcile overlap with variations, prolongation, Fee and other claimed recovery. Present uncertainty explicitly rather than selecting the highest formula result.

To have the head office head built and claimed for you, see our [Delay and disruption cost recovery](<https://www.quantsurv.com/claims/delay-and-disruption-cost-recovery>) service.

## Sources

1.  [Delay and Disruption Protocol, 2nd edition, February 2017](<https://www.scl.org.uk/sites/default/files/documents/SCL_Delay_Protocol_2nd_Edition_Final.pdf>). Society of Construction Law.

[Browse delay and disruption in the Library](<https://www.quantsurv.com/library#topic-delay>)

[Browse the Library](<https://www.quantsurv.com/library>)
