# Compare the assessment line by line

Compare the contractor’s compensation-event assessment with your quotation and the applicable assessment rules. Identify each difference before challenging it.

by [Jack Butler-Kettle](<https://www.quantsurv.com/about#jack-butler-kettle>), MCIArb, NEC Registered Adjudicator · Last reviewed 10 October 2026 · About 1 min readShare

## Why

A challenge is stronger when it addresses a particular quantity, rate, forecast, programme assumption or contractual rule. Actual cost alone may not settle a forecast-based assessment.

## How do I do it?

1.  Place both assessments side by side using the same headings.
2.  Check differences against the applicable cost rules, dividing date and evidence.
3.  Explain the supported corrections and follow the contract’s response or dispute procedure.

Our [NEC compensation event recovery](<https://www.quantsurv.com/claims/nec-compensation-event-recovery>) reconciles the competing assessments so disputed quantities, rates and assumptions are visible.

[Browse changes and extra costs in the Library](<https://www.quantsurv.com/library#topic-changes>)

[Browse the Library](<https://www.quantsurv.com/library>)