# Notify the event promptly using the right procedure

Check and use the compensation-event notice procedure as soon as an event arises. An early warning is a separate communication and may not count as that notice.

by [Jack Butler-Kettle](<https://www.quantsurv.com/about#jack-butler-kettle>), MCIArb, NEC Registered Adjudicator · Last reviewed 10 October 2026 · About 1 min readShare

## Why

A compensation event notification needs the correct sender, recipient, content, method and timing. Check the actual NEC contract and any exceptions rather than assuming every event follows the same time bar.

## How do I do it?

1.  Identify the event and the clause that may apply.
2.  Serve the required compensation-event notice through the permitted channel.
3.  Record delivery, reply dates and any separate early-warning or quotation duties.

Our [Variations and compensation events](<https://www.quantsurv.com/quantity-surveying#client-types>) keeps early warnings and compensation-event notices on their distinct contractual procedures. For a defined setup and handover, [NEC compensation-event process setup](<https://www.quantsurv.com/claims#client-types>) establishes the routine your team will run.

[Browse changes and extra costs in the Library](<https://www.quantsurv.com/library#topic-changes>)

[Browse the Library](<https://www.quantsurv.com/library>)