Source: https://www.quantsurv.com/compensation-events/problems/no-early-warnings
Content format: Markdown version of the public page.
Content reviewed: 2026-10-11

# The early warnings should have been raised and weren't

Our early warning register is empty, and things have already gone wrong on the job that should have been on it.

by [Jack Butler-Kettle](<https://www.quantsurv.com/about#jack-butler-kettle>), MCIArb, NEC Registered Adjudicator · Last reviewed 11 October 2026 · About 2 min readShare

## What does this mean for me?

An early warning is the notice you give as soon as you spot something that could raise cost, delay the work or affect quality. On an NEC job it goes on the early warning register, through the process your contract sets. An empty register tells nobody whether a risk was known, when it arose, or what follows.

An early warning is easy to mix up with a compensation event notification, a quotation or an assessment. They are separate. The contract and the facts decide whether a missing warning affects an assessment, not a general feeling that you should have spoken up.

The cost comes later. The applicable NEC terms may require an assessment on the assumption that a required early warning had been given. Check the contractual procedure and what timely warning could actually have avoided; it is not an automatic penalty for an empty register.

## What do I need to do?

1.  Identify current risks and open a register without backdating earlier entries.
2.  Record the issue, source, owner, proposed mitigation and review date.
3.  Use the contract's warning procedure and an urgent route for risks that cannot wait for a meeting.
4.  Track separate compensation-event requirements independently; an early warning is not a substitute for the required notification.

To have this done for you, see our [Construction contract management](<https://www.quantsurv.com/quantity-surveying#client-types>) service.

[Browse changes and extra costs in the Library](<https://www.quantsurv.com/library#topic-changes>)

[Browse the Library](<https://www.quantsurv.com/library>)
