# What does NEC4 ECC clause 60.1(11) mean?

Unnecessary delay from a test or inspection may support a compensation event under the actual terms.

by [Jack Butler-Kettle](<https://www.quantsurv.com/about#jack-butler-kettle>), MCIArb, NEC Registered Adjudicator · Last reviewed 14 October 2026 · About 2 min readShare

## The answer

Unnecessary delay caused by a test or inspection may support a compensation event under the actual contract. ECC clause 60.1(11) is the main-contract reference; verify the corresponding duty, notice requirements and decision-maker for your package.

Record when the work was ready, the required notice and service, the planned inspection, actual attendance, test duration and release. Identify whether further testing was legitimately required by the result or your own incomplete work. Not every wait for inspection is unnecessary delay.

Check alternative work and mitigation before valuing standing resources or remobilisation. The additional cost period and any Completion effect may differ. Use the relevant programme and cost records, and protect the event-notice period independently of arranging the inspection.

Our [Variations and compensation events](<https://www.quantsurv.com/quantity-surveying#client-types>) connects the required test or inspection with the actual delay and supporting site records. For a contested position: To have a refused event tested against the clause it falls under and pressed to implementation, see our [NEC compensation event recovery](<https://www.quantsurv.com/claims/nec-compensation-event-recovery>) service.

[Browse changes and extra costs in the Library](<https://www.quantsurv.com/library#topic-changes>)

[Browse the Library](<https://www.quantsurv.com/library>)