Source: https://www.quantsurv.com/claims/termination-account-and-completion-cost-assessment
Content format: Markdown version of the public page.
Content reviewed: 2026-10-29

# Termination account and completion-cost assessment

For clients and residential developers

Assess the commercial account and supported completion costs when your contractor’s appointment or a development package ends.

## What is it?

Support with the financial consequences of a terminated contract. Choose an assessment, preparation of the agreed claim or response, or one defined response round. Each stage has a separate fee and endpoint; you only commission the work you need.

The validity of termination, new termination notices and legal representation require appropriate separate advice and authority.

### For clients

Assess the commercial account and completion-cost evidence when your contractor’s appointment ends. We reconcile payments, completed work and evidenced replacement costs using the termination basis confirmed by your legal adviser. We identify your position as the commissioning party and distinguish contractor demands from any claim you may have.

### For residential developers

Reconcile the terminated package and supported completion costs for your development. We distinguish completion of the original scope from improvements or changes in the replacement package. We identify the development contract, phase or package and separate its disputed costs from other project accounts.

## How does it work?

1.  ### You explain the work and the decision you need
    
    You describe your project or development phase, the contractor and your appointed advisers, the result you need and any urgent dates. The introductory conversation checks fit and availability; substantive assessment starts under an accepted instruction.
    
2.  ### We agree the scope, responsibilities and fee
    
    We check suitability, conflicts and capacity, then agree the scope, deliverables and timetable in writing, with a fixed fee or agreed hourly or daily basis. We explain payment terms, VAT and any separate costs before you accept. We agree the items, evidence cut-off and assessment, preparation or response stage you need. We identify your position as the commissioning party and the contract, phase or package concerned, and distinguish contractor demands from any claim you may have. Legal advice, representation and specialist analysis are separately appointed. We confirm responsibility for urgent actions and specialist input.
    
3.  ### You accept the scope and provide the information
    
    You accept the written scope and provide the contract, termination and default correspondence, notices and service evidence, work and payment records, completion costs, mitigation evidence and specialist advice. You identify missing items and the versions supplied; we agree who will obtain anything still needed.
    
4.  ### We check the records and resolve gaps
    
    We check the documents against the agreed scope, dates and versions, raise queries and record the basis on which work can proceed. Missing evidence stays identified; we agree any limited assessment or pause affected work until essential information is available. Live deadlines continue to run.
    
5.  ### We establish the basis and chronology
    
    We record the expressly agreed termination basis with your legal representative and identify unresolved validity or procedure questions. We preserve the relevant records and do not advise you to terminate through an account calculation.
    
6.  ### We assess the evidence and amount
    
    We separate pre-termination work, payments, materials and other account items from claimed completion costs or losses. We check the contractual basis, causation, mitigation, credits and duplication and show the effect of material assumptions.
    
7.  ### We check the findings and explain the options
    
    We check calculations, source references and consistency between the evidence, assumptions and proposed position. We issue the assessment findings before your next-stage decision, identifying weaknesses, missing evidence and proportionate actions, including any specialist work needed.
    
8.  ### You decide whether to proceed
    
    You decide whether to stop after assessment, obtain more evidence or instruct preparation or a response. We confirm the next stage’s scope, fee, deadline and authority before proceeding; no dispute route starts automatically.
    
9.  ### We prepare the instructed submission or response
    
    If commissioned, we prepare the supported termination account or response on the stated basis, with unresolved legal and valuation issues. We check it against the agreed evidence and address one consolidated response only where that stage has been instructed.
    
10.  ### You approve external issue and further action
     
     You approve the position and any external issue. The authorised sender retains the issued version and delivery evidence. Negotiation, offers, admissions, proceedings and enforcement require the appropriate authority and separate scope; unresolved matters remain recorded.
     
11.  ### We explain the result and complete the handover
     
     We issue the output for the stage instructed, supporting calculations and evidence, and the current issue and action record, explain the findings and record unresolved items, next actions, owners and dates. We answer the included clarification and correct our errors. New information, changed scope and later stages need a separate agreement; you decide whether to instruct them.
     

**Timing:** the timetable is agreed in writing at scoping and then kept. Working days start when the agreed scope and required information are available.

We confirm timing after checking the scope and available records. Flag any live deadline when you enquire; it continues to run while information is gathered.

Read [how we agree the scope, fees and instruction](<https://www.quantsurv.com/about#ways-to-work>).

## What do you get?

You receive the outputs for the stages you choose. Each stage has its own scope, fee and endpoint; later stages are optional.

-   Assessment: a written review of the records and commercial consequences on an expressly stated termination basis.
-   Preparation: A supported termination account or response, with assumptions and evidence.
-   Response: a reasoned reply to one consolidated set of comments and a record of what remains open, if separately instructed.

Each fixed piece of work includes one consolidated clarification round requested within 10 working days of issue, unless agreed otherwise. New records or scope need a separate agreement; we correct our own errors without charge.
