Source: https://www.quantsurv.com/claims/subcontractors/delay-and-disruption-cost-recovery
Content format: Markdown version of the public page.
Content reviewed: 2026-10-19

# Delay and disruption cost recovery

For subcontractors

Connect the events affecting your package to supported additional cost or lost productivity.

## What is it?

We examine package progress, labour and plant records and the link between the event and claimed cost, identifying overlaps. Support with the additional costs of delay or disruption. Choose an assessment, preparation of the agreed claim or response, or one defined response round. Each stage has a separate fee and endpoint; you only commission the work you need.

Extension-of-time analysis, disruption methodology requiring specialist input, hearings and later responses are separately scoped. Time entitlement is not assumed to prove cost entitlement.

## How does it work?

1.  ### You explain the work and the decision you need
    
    You describe your trade package and the contractor who appointed you, the result you need and any urgent dates. The introductory conversation checks fit and availability; substantive assessment starts under an accepted instruction.
    
2.  ### We agree the scope, responsibilities and fee
    
    We check suitability, conflicts and capacity, then agree the scope, deliverables and timetable in writing, with a fixed fee or agreed hourly or daily basis. We explain payment terms, VAT and any separate costs before you accept. We agree the items, evidence cut-off and assessment, preparation or response stage you need. We identify your subcontract position and separate your claim against the contractor from any lower-tier liabilities. Legal advice, representation and specialist analysis are separately appointed. We confirm responsibility for urgent actions and specialist input.
    
3.  ### You accept the scope and provide the information
    
    You accept the written scope and provide the contract, event chronology, notices, programme versions, progress and resource records, actual costs, mitigation records and available planning analysis. You identify missing items and the versions supplied; we agree who will obtain anything still needed.
    
4.  ### We check the records and resolve gaps
    
    We check the documents against the agreed scope, dates and versions, raise queries and record the basis on which work can proceed. Missing evidence stays identified; we agree any limited assessment or pause affected work until essential information is available. Live deadlines continue to run.
    
5.  ### We establish the basis and chronology
    
    We distinguish delay, disruption and their alleged effects, identify the monetary basis and map events to affected activities and periods. Programme or causation questions needing a planner are allocated before dependent valuation proceeds.
    
6.  ### We assess the evidence and amount
    
    We connect supported events, effects and costs, test the chosen calculation method and examine mitigation, other causes and overlap. We reconcile costs with records and distinguish time entitlement from money entitlement; one does not automatically prove the other.
    
7.  ### We check the findings and explain the options
    
    We check calculations, source references and consistency between the evidence, assumptions and proposed position. We issue the assessment findings before your next-stage decision, identifying weaknesses, missing evidence and proportionate actions, including any specialist work needed.
    
8.  ### You decide whether to proceed
    
    You decide whether to stop after assessment, obtain more evidence or instruct preparation or a response. We confirm the next stage’s scope, fee, deadline and authority before proceeding; no dispute route starts automatically.
    
9.  ### We prepare the instructed submission or response
    
    If commissioned, we prepare the evidenced cost-claim schedule and narrative for the agreed events, with analysis limits and specialist dependencies. We check it against the agreed evidence and address one consolidated response only where that stage has been instructed.
    
10.  ### You approve external issue and further action
     
     You approve the position and any external issue. The authorised sender retains the issued version and delivery evidence. Negotiation, offers, admissions, proceedings and enforcement require the appropriate authority and separate scope; unresolved matters remain recorded.
     
11.  ### We explain the result and complete the handover
     
     We issue the output for the stage instructed, supporting calculations and evidence, and the current issue and action record, explain the findings and record unresolved items, next actions, owners and dates. We answer the included clarification and correct our errors. New information, changed scope and later stages need a separate agreement; you decide whether to instruct them.
     

**Timing:** the timetable is agreed in writing at scoping and then kept. Working days start when the agreed scope and required information are available.

We confirm timing after checking the scope and available records. Flag any live deadline when you enquire; it continues to run while information is gathered.

Read [how we agree the scope, fees and instruction](<https://www.quantsurv.com/about#ways-to-work>).

## What do you get?

You receive the outputs for the stages you choose. Each stage has its own scope, fee and endpoint; later stages are optional.

-   Assessment: a written review of the available event, effect, contractual and cost evidence, including overlaps.
-   Preparation: An evidenced cost-claim schedule and narrative for the agreed events.
-   Response: a reasoned reply to one consolidated set of comments and a record of what remains open, if separately instructed.

Each fixed piece of work includes one consolidated clarification round requested within 10 working days of issue, unless agreed otherwise. New records or scope need a separate agreement; we correct our own errors without charge.
