Source: https://www.quantsurv.com/claims/subcontractors/defects-and-damage-cost-defence
Content format: Markdown version of the public page.
Content reviewed: 2026-10-19

# Defects and damage cost defence

For subcontractors

Assess the remedial costs claimed against your subcontract business using the available technical findings.

## What is it?

We distinguish your package responsibility from unrelated damage, betterment and unsupported repair costs. Support with the costs claimed for defects or damage. Choose an assessment, preparation of the agreed claim or response, or one defined response round. Each stage has a separate fee and endpoint; you only commission the work you need.

Diagnosis, design responsibility, causation and liability opinions are separate. This does not duplicate an existing contra-charge cost review.

## How does it work?

1.  ### You explain the work and the decision you need
    
    You describe your trade package and the contractor who appointed you, the result you need and any urgent dates. The introductory conversation checks fit and availability; substantive assessment starts under an accepted instruction.
    
2.  ### We agree the scope, responsibilities and fee
    
    We check suitability, conflicts and capacity, then agree the scope, deliverables and timetable in writing, with a fixed fee or agreed hourly or daily basis. We explain payment terms, VAT and any separate costs before you accept. We agree the items, evidence cut-off and assessment, preparation or response stage you need. We identify your subcontract position and separate your claim against the contractor from any lower-tier liabilities. Legal advice, representation and specialist analysis are separately appointed. We confirm responsibility for urgent actions and specialist input.
    
3.  ### You accept the scope and provide the information
    
    You accept the written scope and provide the contract, defect or damage list, photographs and event records, supplied technical findings, agreed repair options, quotations and cost evidence. You identify missing items and the versions supplied; we agree who will obtain anything still needed.
    
4.  ### We check the records and resolve gaps
    
    We check the documents against the agreed scope, dates and versions, raise queries and record the basis on which work can proceed. Missing evidence stays identified; we agree any limited assessment or pause affected work until essential information is available. Live deadlines continue to run.
    
5.  ### We establish the basis and chronology
    
    We establish the instructed commercial question and the technical findings we can rely on. The appointed technical adviser determines cause, compliance and necessary repair scope; we identify unanswered questions before costing dependent work.
    
6.  ### We assess the evidence and amount
    
    We compare supported repair options and quotations, checking quantities, rates, access and associated costs. We separate necessary repairs from improvements or unrelated work and account for mitigation, credits and overlapping amounts.
    
7.  ### We check the findings and explain the options
    
    We check calculations, source references and consistency between the evidence, assumptions and proposed position. We issue the assessment findings before your next-stage decision, identifying weaknesses, missing evidence and proportionate actions, including any specialist work needed.
    
8.  ### You decide whether to proceed
    
    You decide whether to stop after assessment, obtain more evidence or instruct preparation or a response. We confirm the next stage’s scope, fee, deadline and authority before proceeding; no dispute route starts automatically.
    
9.  ### We prepare the instructed submission or response
    
    If commissioned, we prepare the itemised remedial-cost assessment or response, with technical assumptions and supporting cost references. We check it against the agreed evidence and address one consolidated response only where that stage has been instructed.
    
10.  ### You approve external issue and further action
     
     You approve the position and any external issue. The authorised sender retains the issued version and delivery evidence. Negotiation, offers, admissions, proceedings and enforcement require the appropriate authority and separate scope; unresolved matters remain recorded.
     
11.  ### We explain the result and complete the handover
     
     We issue the output for the stage instructed, supporting calculations and evidence, and the current issue and action record, explain the findings and record unresolved items, next actions, owners and dates. We answer the included clarification and correct our errors. New information, changed scope and later stages need a separate agreement; you decide whether to instruct them.
     

**Timing:** the action timetable is agreed against the actual deadlines and available records. We aim to respond to enquiries within one working day; substantive work starts only after capacity and instructions are confirmed. Working days start when the agreed scope and required information are available.

We confirm timing after checking the scope and available records. Flag any live deadline when you enquire; it continues to run while information is gathered.

Read [how we agree the scope, fees and instruction](<https://www.quantsurv.com/about#ways-to-work>).

## What do you get?

You receive the outputs for the stages you choose. Each stage has its own scope, fee and endpoint; later stages are optional.

-   Assessment: a written review of the claimed remedial scope and costs against the evidence and supplied technical basis.
-   Preparation: A cost assessment, allowance reconciliation and reasoned cost response.
-   Response: a reasoned reply to one consolidated set of comments and a record of what remains open, if separately instructed.

Each fixed piece of work includes one consolidated clarification round requested within 10 working days of issue, unless agreed otherwise. New records or scope need a separate agreement; we correct our own errors without charge.
