Source: https://www.quantsurv.com/claims-against-you/faq/what-does-a-claims-consultant-do
Content format: Markdown version of the public page.
Content reviewed: 2026-10-15

# What does a construction claims consultant do?

A construction claims consultant organises the records, tests the contractual basis and assesses the figures for a claim you are making or defending.

by [Jack Butler-Kettle](<https://www.quantsurv.com/about#jack-butler-kettle>), MCIArb, NEC Registered Adjudicator · Last reviewed 15 October 2026 · About 5 min readShare

## The answer

A construction claims consultant investigates the issue, organises the records, assesses the contractual position and tests the amount or time being claimed. The work can support a claim you make or a response to a claim against you. The agreed appointment determines which parts the consultant handles and where other specialists are needed.

For the definition, typical backgrounds and distinction from a solicitor or adjudicator, see [what is a construction claims consultant?](<https://www.quantsurv.com/library/definitions/construction-claims-consultant>). This page explains the work and its outputs.

## What work do they carry out?

**Establish the issue and urgent actions.** The consultant identifies the parties, executed agreement, amendments, disputed events, remedies sought and current procedural position. They flag notices or response dates needing prompt attention and agree who owns each action. They check the available evidence and identify material that is missing or inconsistent.

**Build a chronology and evidence record.** Instructions, correspondence, drawings, diaries, photographs, programmes and cost records are organised by event and date. Each assertion should connect to a record. The consultant identifies conflicting evidence as well as material supporting the client's position, and separates contemporaneous records from later recollections.

**Assess the basis, cause and consequences.** The consultant relates the alleged event to the actual scope and contract provisions, including amendments and relevant notice requirements. They distinguish what happened, why a remedy is claimed, and the evidence for the alleged consequence. Legal interpretation, technical diagnosis and programme analysis need the appropriate specialist where they fall outside the appointment or competence.

**Calculate the claim or test the amount received.** For a claim being prepared, the consultant checks quantities, rates, costs, payments already received and any overlapping amounts. For a claim being defended, they examine the other party's calculation and identify supported, disputed and unproven items, with reasons for each position.

**Prepare a submission and support discussions.** The consultant brings the narrative, contractual position, calculation and referenced evidence into a consistent document. They can prepare a response, identify concessions requiring approval and support commercial negotiation within the authority given. The client should know what remains uncertain and which decisions or instructions are needed.

## What documents do they produce?

The output may be an initial issue review, document request and action list. A [Claim review](<https://www.quantsurv.com/fixed-price/claim-review>) can establish the evidence gaps and proportionate next step before commissioning a full submission. Preparing a review does not stop contractual or procedural deadlines.

Typical outputs are an event chronology, evidence index and issue schedule. Give each record a stable reference so the chronology and issue schedule can be traced to their sources.

Outputs can include a measured valuation, rate build-up, loss-and-expense assessment, reconciliation or item-by-item response. The Scott schedule provides one way to put opposing positions and evidence references alongside each other. The appropriate format depends on the issue and procedure.

## Who do they work for?

A client, homeowner, contractor or subcontractor may appoint a claims consultant to prepare a claim or answer one. The consultant must be clear about whose position they advise on.

## What is outside the appointment?

For delay and disruption, a planner may need to analyse the programme while the commercial consultant assesses the supported cost. [RICS guidance on ascertaining loss and expense](<https://www.rics.org/profession-standards/rics-standards-and-guidance/sector-standards/construction-standards/black-book/ascertaining-loss-and-expense>) addresses calculation in accordance with the contract; extra expenditure is not automatically recoverable from the other party.

A claim document is not itself a decision or a guarantee of recovery. Record precisely what any agreement settles and obtain appropriate advice on its wording. [Construction dispute-resolution options](<https://www.quantsurv.com/library/construction-disputes>) explains the possible routes if agreement is not reached.

Quantsurv provides the agreed figures-and-evidence work and commercial negotiation support. A separately appointed representative conducts proceedings; a solicitor, planner or technical specialist handles the relevant specialist questions.

## What should you agree before appointing one?

Agree the issue, scope, deliverables, responsibilities, fee basis and timetable before starting. Identify urgent dates, who provides the records and who is authorised to make decisions.

Ask who checks the work and which legal, planning or technical appointments are needed. A claims appointment does not automatically include conducting proceedings.

## Example

### The facts

A subcontractor receives a £310,000 counterclaim from their main contractor and brings in a claims consultant to test it before any answer goes back.

### What happens

1.  The consultant tests the basis of each head against the subcontract.
    
2.  The chronology the counterclaim relies on is checked against the subcontractor's own site records.
    
3.  Each head is recomputed from the main contractor's build-ups and the subcontractor's records.
    
4.  What is supported, what is duplicated and what is unproven is identified.
    
5.  The answer is written with the reasons for each finding.
    

### What this shows

The answer goes back with each head tested and its reasons stated.

The evidence remains traceable if the dispute proceeds. An assessment does not guarantee a settlement or decision.

For unpaid changes, see [Variation Recovery](<https://www.quantsurv.com/claims/variation-recovery>); for a demand against you, see [Claim assessment and response](<https://www.quantsurv.com/claims#client-types>). Both pages explain our role and the work you receive.

## Sources

1.  [Ascertaining loss and expense, second edition, July 2024](<https://www.rics.org/profession-standards/rics-standards-and-guidance/sector-standards/construction-standards/black-book/ascertaining-loss-and-expense>). RICS.

[Browse dispute resolution and defence in the Library](<https://www.quantsurv.com/library#topic-defence>)

[Browse the Library](<https://www.quantsurv.com/library>)
